Capital One – WC’s and Changing rooms

Duration: 32 weeks (two phases)

Consultants:  JLL – contract administrators, TS.DS – architects, Axis – m&e consultants

Project description:  

Central Core WC’s:

Complete strip out back to the structural shell of the existing core WC’s over three floors.  Renewal of the M&E services to suit the revised layouts.  New MF ceilings curved on one side to meet the wall were finished in natural clay plaster with a feature lighting recess to one end.  All new sanitaryware, cubicles and a HIMACS finished trough sink were installed to each WC.  Bespoke architectural metal work consisting of concealed dryer mirror housings and planter shelves were provided in each space.

 

Changing rooms:

Demolition and strip out of the existing changing room area to expose the existing services and allow complete reconfiguration of the space.  Existing M&E installations were stripped back or adapted to suit the new layout and to improve the aesthetic as all services were to be left exposed on completion.  A new suite of WC’s was created in the entrance lobby with a curved, clay plaster finished feature wall provided.  The new larger changing room spaces were fitted out with new showers and cubicles, bespoke vanity units, planter shelves, feature lighting and perimeter lockers.